Win the 5CP Game in PJM's High-Stakes Energy Market

PJM’s capacity market doesn’t forgive mistakes. One missed peak can cost you hundreds of thousands of dollars. We built the tools to make sure that never happens.

Trusted by Top Companies

Built for PJM's
Capacity-Driven Market

PJM is the largest wholesale electricity market in North America, serving over 65 million people across 13 states and D.C. But size doesn’t mean simple. PJM’s capacity market is driven by a single brutal mechanism: the Five Coincident Peaks (5CP). Miss those five hours during summer, and your facility’s capacity charges skyrocket for the entire next year.

Industrial and commercial facilities are seeing capacity charges surge from ~$10,560/MW-year in 2024/2025 to a projected $120,147/MW-year for 2026/2027 — a 10x increase. Data center growth, manufacturing onshoring, and asset electrification are pushing PJM demand to record highs. The stakes have never been higher.

Up to

Per MW of Curtailment
$ 0

Designed by Energy Management Experts

Our platform was built from the ground up for PJM market participants. Every feature exists because real industrial and commercial facilities needed it.

Real-time Facility & Grid Data
Track your facility's energy usage against real-time PJM grid data and live market prices — all in one view.
5CP Peak Window
Hour-by-hour forecast of peak risk, updated continuously based on PJM grid conditions and weather.
12-Day Peak Outlook
Every Sunday, receive a 12-day forecast of the top 5 potential peak hours so you can plan ahead.
Alarms & Notifications
Instant alerts via SMS, email, and phone if any asset or utility main deviates from normal operating ranges.
Energy Benchmarking
Compare energy performance across time periods or between similar assets and facilities.
Bill Analysis
Track and analyze all utility bills on one centralized platform. Spot cost drivers before they surprise you.
Production Data Analysis
Link energy and production data to pinpoint cost drivers, evaluate CO₂ intensity, and optimize efficiency.
EDI, AI Energy Asisstant
Ask EDI anything about your energy consumption, costs, or emissions and get instant reports and insights.

Intelligent DER Optimization with NeuraCharge™

If you operate battery storage, solar, generators, or any other Distributed Energy Resources in PJM, you need more than monitoring — you need optimization. NeuraCharge™ is Edgecom’s advanced AI-driven vertical EMS built specifically for the management and optimization of DERs. It connects directly to PJM market signals and automates dispatch to maximize the financial performance of your assets.

Coincident Peak Shaving

Automatically dispatch your BESS to curtail load during PJM’s 5CP windows. Reduce your Peak Load Contribution and slash capacity charges.

Energy Arbitrage

Charge when PJM prices are low, discharge when they’re high. NeuraCharge™ uses real-time and day-ahead market data to optimize every cycle.

Demand Response & Ancillary Services

Participate in PJM’s Demand Response and ancillary service programs automatically. Turn grid events into revenue without manual intervention.

Technology-Agnostic

Supports PV, BESS, natural gas generators, and controllable loads. Integrates with EMS, SCADA, BMS, and MPC platforms — whatever you’re running.

Backed by 24/7 NOC Monitoring

Edgecom’s Toronto-based Network Operations Center provides round-the-clock remote monitoring, rapid incident escalation, and expert support for your DER assets. Reliable. Secure. Always on.

Our Suite of Energy Management Solutions

dataTrack™

All facility data — electricity, water, gas, bills, AI insights.

AI Energy CoPilot

The AI Energy CoPilot is a cutting-edge solution for improving energy usage and boosting operational efficiency in real time.

pTrack®

AI-powered 5CP peak prediction. Never miss a capacity peak.

NeuraCharge™

AI-driven DER optimization — peak shaving, arbitrage, ancillary services.

Demand Response

Turn your load into revenue during PJM peak events.

Loved by Our Customers

We’ve helped our customers save significantly on energy costs. Hear how directly from them.

PJM Energy Market FAQ

What is the 5CP and why does it matter?
The 5CP (Five Coincident Peaks) is the mechanism PJM uses to determine your share of capacity costs. Your facility’s demand during the five highest-demand hours on the PJM grid each summer sets your Peak Load Contribution (PLC), which drives your capacity charges for the entire next year. Capacity prices have surged from ~$10,560/MW-year in 2024/2025 to a projected $120,147/MW-year for 2026/2027. Missing even one peak can cost a facility tens of thousands of dollars extra per year.
Why does PJM require specialized solutions
Because the 5CP is genuinely hard. Throughout the summer, the PJM grid experiences hundreds of ‘mini-peaks’ that look like they could be record-breakers. Without predictive tools built specifically for PJM, facilities end up curtailing operations dozens of times unnecessarily — and often still miss the real peaks. Generic energy tools just aren’t built for this.
How does pTrack® predict PJM peaks?
pTrack® uses AI algorithms trained specifically on PJM market data, weather patterns, and historical demand behavior. It achieves a 99% peak prediction success rate, delivering 12-day outlooks, day-before standby notices, and day-of alerts with curtailment windows. The model gets better over time as it learns from each season.
Can your solutions integrate with PJM market systems?
Yes. Our platform is built to work with PJM data feeds and protocols. Whether you’re managing a single industrial facility or a portfolio of sites, we connect seamlessly to the data you need without workarounds.
Do I need to be a large industrial consumer to benefit?
Not at all. pTrack® and dataTrack™ are valuable for any facility paying capacity charges in PJM — commercial buildings, manufacturers, food processors, cold storage, data centers, and more. If 5CP charges show up on your bill, we can help.
How quickly can we implement?
Most clients are up and running within 4–8 weeks. We work with your team to ensure smooth integration that doesn’t disrupt day-to-day operations.
What kind of support do you provide?
Full onboarding, training, and ongoing support from people who actually understand PJM’s market. We’re here year-round — not just during peak season.
What is NeuraCharge™ and who is it for?
NeuraCharge™ is Edgecom’s AI-driven vertical Energy Management System for facilities that own or operate Distributed Energy Resources — battery storage (BESS), solar (PV), generators, or controllable loads. If you have assets that can charge, discharge, or respond to grid signals, NeuraCharge™ automates and optimizes how they participate in PJM’s capacity, energy, and ancillary service markets.
How does NeuraCharge™ help with PJM's 5CP specifically:
NeuraCharge™ integrates directly with pTrack®’s peak predictions and PJM live market data. When a 5CP peak window is approaching, it automatically dispatches your BESS to curtail load, reducing your facility’s Peak Load Contribution. This means lower capacity charges for the entire following year — executed automatically, without manual intervention.
What does the 24/7 NOC provide?
Edgecom’s Toronto-based Network Operations Center monitors your DER assets around the clock. The NOC team provides rapid identification and escalation of system abnormalities, continuous tracking of key performance indicators, immediate activation of emergency protocols, and verification of automated safety interlocks. Your assets are covered whether it’s 2 PM or 2 AM.
How does dataTrack™ help with PJM operations?
dataTrack™ gives you real-time visibility into your facility’s energy consumption, helping you understand your load profile, identify demand spikes, and optimize when and how you use energy. That visibility directly supports 5CP management and makes demand response participation far more effective.

Resources

pTrack® PJM Brochure

Learn how pTrack® PJM can help you hit all your peaks.

PJM 5CP Overview Brochure

Find out what’s driving up your capacity costs.

NeuraCharge™ Technical Brochure

Dive deeper into the capabilities of NeuraCharge™.

PJM Pricing Crisis eBook

Understanding the 10x surge in capacity charges.

Start Reducing Your Capacity Costs Today.

PJM’s 5CP season runs June through September. Don’t wait until summer to find out what a missed peak costs you. Get set up now with tools that actually work.

PJM Peak Pricing Crisis 2026

One Missed Peak Hour Could Cost You Thousands On Energy Bills – Will You Let This Happen?!