Image of a jar of coins with a plant growing out of it

Power Conditioning Reduces Costs

The solution provided ride-through for voltage sags which reduced the number of power interruptions.

A suspension manufacturing facility in southern Ontario had a very low power factor. The Power Factor penalty on their bills was thousands of dollars a month.  

Using a Power Conditioning Device from Edgecom Energy, the facility was able to completely eliminate this fee.

The Power Conditioning system provided ride-through for voltage sags which reduced the number of power interruptions. Power interruptions have gone from an average of eight per per year, to zero in 2019.

The facility also experienced less maintenance down-time.  Significant Save on Energy rebates further shortened the payback of this investment.

ā€

Increased Machinery lifetime

Project Cost after incentive: $17,594

Simple Payback: 2.12 Years

Share the Post:
Facebook
Twitter
LinkedIn

Related Posts

Join Our Newsletter

Stay up to date with the latest industry news.

Edgecom Energy Logo in White

5775 Yonge Street, Suite 1902 (Mailbox #34)
Toronto, Ontario, Canada, M2M 4J1

Builders & Developers

Ā© 2024 Ā· Edgecom Energy

Renewable Energy

Save 50% On Your Next Energy Efficiency Project

Learn more about Canada's Industrial Facility track.

energy project

Save up to 50% On Your Energy Efficiency Project!

The Industrial Facility track covers up to 50% of eligible costs for your next energy efficiency project. Deadline is August 30!

Buyer's Guide to Industrial Energy Management Mockup

Buyer's Guide

Download our new eBook for free!