Image of an operational center

Network Operations Centre Explainer

Edgecom Energy's NOC seamlessly integrates into your Distributed Energy Resource (DER) operations and connects your facilities' various energy assets to our energy portal. The system maximizes the savings and income from your DER using Edgecom Energy's industry leading coincident peak and price prediction engines. Our security infrastructure and redundant connectivity ensures the highest level of security.

In the explainer below, learn how Edgecom Energy’s Network Operation Centre (NOC) has been designed from the ground up to optimizes the secure dispatch of your Distributed Energy Resources (DERs):

Share the Post:
Facebook
Twitter
LinkedIn

Related Posts

Join Our Newsletter

Stay up to date with the latest industry news.

Edgecom Energy Logo in White

5775 Yonge Street, Suite 1902 (Mailbox #34)
Toronto, Ontario, Canada, M2M 4J1

Builders & Developers

Ā© 2024 Ā· Edgecom Energy

Renewable Energy

Save 50% On Your Next Energy Efficiency Project

Learn more about Canada's Industrial Facility track.

energy project

Save up to 50% On Your Energy Efficiency Project!

The Industrial Facility track covers up to 50% of eligible costs for your next energy efficiency project. Deadline is August 30!

Buyer's Guide to Industrial Energy Management Mockup

Buyer's Guide

Download our new eBook for free!